检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:KASMAEE Sara GHOLAMNEJAD Javad YARAHMADI Alireza MOJTAHEDZADEH Hosein
机构地区:[1]Department of Mining and Metallurgical Engineering, Yazd University
出 处:《Mining Science and Technology》2010年第6期855-860,共6页矿业科学技术(英文版)
摘 要:An attempt to estimate the reserves in the High Phosphorous stockpile (HP) at the Choghart Iron mine of Iran was carded out using geostatistical modeling. Grade and tonnage estimates of ore stockpiles can help convert them into a valuable ore reserve. This is valuable in consideration of increasing metal demand, and the depletion of in situ ore reserves, around the world. Estimation of reserves in stockpiles is difficult partly because of geological and grade discontinuities created during the dumping of the ore piles. Data input for the HP stockpile at Choghart was performed based upon pre-existing information gathered during extraction from the various mining benches. After establishing the input data files the reserve estimates were found using geostatistical methods aided by the international mining software SURPAC. The stockpile was divided in to three domains and the reserves in each domain were estimated separately. A grade block model was used to compute the reserve. Fe% and P% were estimated using the Ordinary Kriging method. The results showed that the total tonnage of the HP stockpile is 4.5 million tons with an average zrade of 55% Fe and 1.03% P.An attempt to estimate the reserves in the High Phosphorous stockpile (HP) at the Choghart Iron mine of Iran was car-ried out using geostatistical modeling. Grade and tonnage estimates of ore stockpiles can help convert them into a valuable ore re-serve. This is valuable in consideration of increasing metal demand, and the depletion of in situ ore reserves, around the world. Estimation of reserves in stockpiles is difficult partly because of geological and grade discontinuities created during the dumping of the ore piles. Data input for the HP stockpile at Choghart was performed based upon pre-existing information gathered during ex-traction from the various mining benches. After establishing the input data files the reserve estimates were found using geostatisti-cal methods aided by the international mining software SURPAC. The stockpile was divided in to three domains and the reserves in each domain were estimated separately. A grade block model was used to compute the reserve. Fe% and P% were estimated using the Ordinary Kriging method. The results showed that the total tonnage of the HP stockpile is 4.5 million tons with an average grade of 55% Fe and 1.03% P.
关 键 词:stockpile reserve estimation GEOSTATISTICS Ordinary Kriging
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28