湿法脱硫机组封闭旁路后试运特点及可靠性分析  被引量:3

Characteristics and Reliability of Power Plant in Trial Operation with WDFG Bypass System Closed

在线阅读下载全文

作  者:张志强[1] 杨杰[1] 陈秋[1] 郁金星[1] 刘玉壮[1] 

机构地区:[1]河北省电力研究院,石家庄050021

出  处:《电力建设》2010年第12期87-89,共3页Electric Power Construction

基  金:国家工程项目(发改能源[2007]1313号)

摘  要:河北国华定洲发电厂3号机组为国内首台取消旁路并保留有独立增压风机的660 MW超临界空冷机组,其脱硫系统的试运过程与其他机组有很大不同。介绍了定洲电厂3号机组湿法烟气脱硫装置封闭旁路后的试运过程,阐述了因旁路封闭引起的系统问题和解决方案,并重点分析脱硫系统影响主机可靠性的各项因素,为机组取消旁路等提供参考。Hebei Guohua Dingzhou Power Plant Unit No.9 is China's first 660 MW supercritical and air-cooling system equipped with independent booster fans and with the WFGD bypass system closed;and its trial operation is different from other units.This paper introduced the trial operation process,analyzed problems caused by cancellation of bypass and proposed corresponding solutions,and emphasized on the influence on the reliability of the major unit,which provides reference for other cases of bypass cancellation.

关 键 词:湿法烟气脱硫 旁路 试运 增压风机 超临界 空冷机组 

分 类 号:TM621.73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象