检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张志强[1] 杨杰[1] 陈秋[1] 郁金星[1] 刘玉壮[1]
出 处:《电力建设》2010年第12期87-89,共3页Electric Power Construction
基 金:国家工程项目(发改能源[2007]1313号)
摘 要:河北国华定洲发电厂3号机组为国内首台取消旁路并保留有独立增压风机的660 MW超临界空冷机组,其脱硫系统的试运过程与其他机组有很大不同。介绍了定洲电厂3号机组湿法烟气脱硫装置封闭旁路后的试运过程,阐述了因旁路封闭引起的系统问题和解决方案,并重点分析脱硫系统影响主机可靠性的各项因素,为机组取消旁路等提供参考。Hebei Guohua Dingzhou Power Plant Unit No.9 is China's first 660 MW supercritical and air-cooling system equipped with independent booster fans and with the WFGD bypass system closed;and its trial operation is different from other units.This paper introduced the trial operation process,analyzed problems caused by cancellation of bypass and proposed corresponding solutions,and emphasized on the influence on the reliability of the major unit,which provides reference for other cases of bypass cancellation.
关 键 词:湿法烟气脱硫 旁路 试运 增压风机 超临界 空冷机组
分 类 号:TM621.73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.94.189