检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘文波
机构地区:[1]中国葛洲坝集团第一工程有限公司,湖北宜昌443002
出 处:《水力发电》2010年第2期48-49,共2页Water Power
摘 要:深溪沟水电站厂房坝段尾水扩散段两边墩内弧线由圆变方渐变成形。为保证混凝土表面光滑美观,传统的施工工艺是在模板上贴一层铁皮,并用铁钉固定,这样会出现铁钉印子,而且铁皮容易鼓包。在深溪沟水电站工程施工中是在木模板上贴一层铝塑板,采用万能胶固定,操作简便,经济性也好,质量也易保证。The tailrace diffusion section of Shenxigou hydropower plant dam is gradually changed from round to square.In order to ensure the concrete surface smooth,the formwork is used for the concrete construction.In traditional construction process,a layer of iron sheet is posted in formwork surface fixed by nail.The nail mark will appear in concrete surface and the iron easy to bulge.In the construction of Shenxigou Hydropower Project,a layer of aluminum-plastic plate is paste to wood formwork,it is easy to operate and has good economy and quality.
分 类 号:TU755.21[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249