检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石亮[1] 杨晔[1] 卢晶[1] 高瑞力[1] 刘磊[1]
出 处:《中国造船》2010年第A02期447-451,共5页Shipbuilding of China
摘 要:在海洋吊机主吊机的建造过程中,对三个关键工艺步骤进行ANSYS有限元分析,结果减少了返工量,提高了可靠性,保证了各部件组装精度满足技术要求,从而保证了整个扒杆的建造质量。Boom is a major component of the marine crane, has truss structure commonly, and adopts high-strength structural steel to reduce the structural weight and to improve the reliability. To reduce the work, which should be done again, and to improve the acceptance ratio, the accuracy of the construction is needed to be improved. ANSYS is used,on the key steps in the construction process, to ensure that the assembly accuracy meets the technical requirements. Therefore the quality control of the whole boom can be assured.
分 类 号:U671[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3