基于ANSYS的海洋吊机扒杆建造精度控制  

Accuracy Control of Marine Crane Boom Construction Based on ANSYS

在线阅读下载全文

作  者:石亮[1] 杨晔[1] 卢晶[1] 高瑞力[1] 刘磊[1] 

机构地区:[1]海洋石油工程股份有限公司,天津300452

出  处:《中国造船》2010年第A02期447-451,共5页Shipbuilding of China

摘  要:在海洋吊机主吊机的建造过程中,对三个关键工艺步骤进行ANSYS有限元分析,结果减少了返工量,提高了可靠性,保证了各部件组装精度满足技术要求,从而保证了整个扒杆的建造质量。Boom is a major component of the marine crane, has truss structure commonly, and adopts high-strength structural steel to reduce the structural weight and to improve the reliability. To reduce the work, which should be done again, and to improve the acceptance ratio, the accuracy of the construction is needed to be improved. ANSYS is used,on the key steps in the construction process, to ensure that the assembly accuracy meets the technical requirements. Therefore the quality control of the whole boom can be assured.

关 键 词:扒杆 海洋吊机 有限元 精度控制 

分 类 号:U671[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象