作 者:查鲲鹏[1] 温家良[1] 王高勇[1] 杨晓楠[1] 周军川[1] 高冲[1] David A Jackson
机构地区:[1]中国电力科学研究院,北京市海淀区100192 [2]AREVA输配电集团
出 处:《电网技术》2010年第12期136-141,共6页Power System Technology
基 金:国家自然科学基金项目(50677064)~~
摘 要:对灵宝扩建工程6英寸换流阀的设计、绝缘和运行试验进行了介绍,并给出了试验电路拓扑。灵宝扩建工程是世界上首次基于6英寸晶闸管换流阀将额定直流电流提升至4 500 A的工程实践。直流换流阀的设计是直流输电工程的关键技术之一,直接影响工程的安全可靠运行。ABSTRACT: The design, insulation tests and operation tests of 6-inch thyristor valves applied in Lingbao extension project are presented respectively, and the topology of the testing circuit is given. The 6-inch thyristor valve that lifts the rated DC current to 4 500 A, which is applied in Lingbao extension project in China, is the first engineering practice in the world. The design of DC thyristor valve is one of the key problems in HVDC power transmission project, and it directly impacts the secure and reliable operation of HVDC power transmission.
分 类 号:TM83[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90