兰新铁路冻害原因分析及整治措施  被引量:4

Causes Analysis and Treatment Measures of Freezing Damage of Lanzhou-Xinjiang Railway

在线阅读下载全文

作  者:史宏章[1] 于春海[2] 杨有海[2] 

机构地区:[1]兰州铁路局武威工务段,甘肃武威733000 [2]兰州交通大学土木工程学院,兰州730070

出  处:《路基工程》2010年第6期202-204,共3页Subgrade Engineering

摘  要:分析兰新铁路冻害的原因,提出了兰新铁路冻害分为道床冻害和路基冻害,道床冻害是由于外界黄土进入道床及翻浆冒泥而产生。通过室内试验数据,说明路基土的土质、含水率及温度是路基冻害的主要原因。阐述了兰新铁路冻害整治的思路及措施。This paper analyzes the causes of freezing damage of Lanzhou-Xinjiang Railway and puts forward that such freezing damage is divided into roadbed damage and subgrade damage.Roadbed damage is produced by soil burst and inrush due to external loess entering roadbed.Through indoor test data,it is indicated that the quality,water content and temperature of subgrade soil are the main causes of subgrade freezing damage.Finally,this paper describes treatment concept and measures of freezing damage of Lanzhou-Xinjiang Railway.

关 键 词:铁路冻害 道床冻胀 路基冻胀 冻害整治 

分 类 号:U213.14[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象