检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《高压电器》2010年第12期54-58,共5页High Voltage Apparatus
摘 要:光伏系统与常规电源的发电特点不同,使得大型光伏电站与配电网互联的研究变得复杂和困难。本文基于PSCAD/EMTDC仿真平台,从光伏电站和配电网的特性出发,建立了含MPPT的实用光伏方阵仿真模型和含集中式光伏电站的配电网仿真模型,又以配电网中接入点母线电压暂态为考虑因素,就光伏电站接入电网的选点问题进行了仿真研究。仿真结果表明,光伏电站接入选点时配电网络的短路容量、负荷水平对配网电压暂态有较大的影响,而配电网络的R/X比和接入点母线电压等级对配网电压暂态的影响相对较小。As photovoltaic(PV) systems′characteristics are different from that of regular power generations,the situation of a large-scale PV station interconnecting with distribution network is special and complicated.Based on PV plant and distribution′s characteristics,the simulation models of a PV system include maximum power point tracking(MPPT) and a distribution network with large-scale PV plant are built in PSACD/EMTDC.Considering the voltage transient of access points that PV plants connect to DN,simulations are performed to optimize the placement of access points.The simulation results show that the short-circuit capacity and load level of distribution have a great impact on voltage transient in distribution,while the effects of R/X ratio of distribution and voltage class of access point are relatively small.
关 键 词:光伏电站 配电网 接入选点 电压暂态 PSCAD/EMTDC
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15