检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网电力科学研究院/南京南瑞集团公司,江苏省南京市210003
出 处:《水电自动化与大坝监测》2010年第6期31-33,共3页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:叙述了水管式沉降仪的原理和结构,分析了目前使用中存在的一些问题,如水管式沉降仪测量时给管路充水容易、排水困难、水管沉降仪管路埋设时通常采用的整体坡降法对于施工影响较大等。结合在实际安装和使用过程中的经验、教训,并经过实验室和工程实际的运用,最后提出了水管沉降仪的结构及埋设方法的几点改进意见,如采用双排水系统解决系统排水难的问题、采用局部坡降法埋设解决整体坡降法埋设对施工干扰大的问题。The principles and structure of hydraulic overflow settlement gauge are described.The existing problems during its application are analyzed.For example,the pipeline is easily filled with water,but its drainage is very difficult.The commonly used overall gradient method for installing the hydraulic overflow settlement gauge has great impact on the construction.Based on the experience and lessons from the actual installation of the gauge both in laboratories and projects,several suggestions for improving its structure and installing methods,such as use of the dual drainage system to solve the problem of difficult drainage and employment of the local gradient method to solve the problem of great impact on the construction by use of the overall gradient method.
分 类 号:TV698.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.242.144