检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部堤防安全及病害防治工程技术研究中心,河南郑州450003 [2]黄河水利科学研究院,河南郑州450003
出 处:《水利水电技术》2010年第12期38-41,共4页Water Resources and Hydropower Engineering
基 金:科技部公益性科研院所长基金资助项目(HKY-JBYW-2009-20);国家重点基础研究发展计划"973"计划(2007CB714103)
摘 要:针对中里坪拱坝实际工程情况,运用多拱梁法进行了应力计算和分析,以便掌握坝体在不同荷载组合工况的应力分布状况,为大坝可行性评价及蓄水过程提供理论依据。计算结果表明:(1)中里坪拱坝的主压应力在三种组合工况下均满足规范要求,拱坝结构有一定的安全裕度;(2)主拉应力也都在规范允许范围内。For the actual operation condition of Zhongliping Masonry Arch Dam,the stress calculation and analysis are made with the multi-arch beam method,so as to know the stress distributions under the operation conditions of various loading combinations,and then provides a theoretical basis for the feasibility evaluation on the dam body and the impoundment process.The calculation shows that not only the principal compressive stresses of Zhongliping Masonry Arch Dam under three loading combination conditions can all meet the specifications concerned with a certain safety allowance for the arch structure,but all the principal tensile stresses are also within the allowable area specified.
关 键 词:浆砌石拱坝 坝体应力 荷载组合 拱梁分载法 中里坪浆砌石拱坝
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31