检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西双版纳州水利局,云南景洪666100 [2]三峡大学水利与环境学院,湖北宜昌443002
出 处:《云南水力发电》2010年第6期87-90,共4页Yunnan Water Power
摘 要:水电工程风险量化分析普遍采用风险期望值模型,这将导致高损失低概率与低损失高概率的计算结果可能相同。分割多目标风险法(PMRM)给定分割概率,计算给定概率范围内的条件概率,得到多种风险函数,最后将这些风险函数加入到风险决策模型的目标函数中进行风险决策。在湖北鄂坪面板堆石坝施工度汛中,应用分割多目标风险方法,计算不同措施组合的风险,结果合理,能克服传统风险期望值模型的缺点,能为决策者提供科学依据。The risk expected value model has widely been used for risk quantization analysis of a hydropower project,which will lead to that the calculation result of high loss and low probability would likely be the same as that of low loss and high probability.The partition multiple target risk method(PMRM) gives the partition probability and the calculation gives the condition probability,from which various risk functions are obtained,and then these risk functions are added to the target functions of the risk decision-making model to make a risk decision.The partition multiple target risk method was used to calculate the risks of the combinations of different measures in tiding over floods during construction of the Eping concrete face rockfill dam in Hubei Province,and the results proved rational,which can overcome the shortcomings of the traditional risk expected value model and provide the scientific basis for decision makers.
分 类 号:O211.9[理学—概率论与数理统计] TV871.3[理学—数学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3