检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中船第九设计研究院工程有限公司,上海200063
出 处:《水运工程》2010年第12期31-36,共6页Port & Waterway Engineering
基 金:上海市科学技术发展基金(08201201103)
摘 要:对外高桥造船有限公司船坞工程的锚拉式板桩坞壁结构监测成果进行分析研究,发现坞壁位移的主要原因是施工期墙前土体的蠕变变形。根据分析研究结果,在#2船坞接长改造工程中,采用了设置临时钢支撑、改进锚碇结构等措施,有效地减少坞壁位移,同时使锚碇施工工序不影响坞室开挖工序,提高了效率,保证了施工质量,达到了预期目标。设置临时钢支撑限制坞壁位移的方法在船坞工程中首次使用,为同类工程设计积累了经验。The analysis and study of the anchored sheet pile retaining wall of the Waigaoqiao Shipbuilding Co.dock engineering show that the creep deformation in front of the wall during construction is the major cause of the dock wall displacement.According to the results,several improved methods were taken in the expansion project of 2nd dock,including temporarily setting steel support,improving the anchored structure design,etc.,so that the dock wall displacement was effectively reduced and the dock excavation process was not influenced by the anchorage construction process.The method of temporarily setting steel support to reduce the dock wall displacement was firstly used in the dock project and it has accumulated significant experience for the similar projects design.
分 类 号:U673.33[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.185.164