船坞接长工程中锚拉式板桩坞壁结构设计  被引量:4

Design of anchored sheet pile retaining wall of the dock in dock expansion engineering

在线阅读下载全文

作  者:费永成[1] 顾倩燕[1] 张亚雄[1] 

机构地区:[1]中船第九设计研究院工程有限公司,上海200063

出  处:《水运工程》2010年第12期31-36,共6页Port & Waterway Engineering

基  金:上海市科学技术发展基金(08201201103)

摘  要:对外高桥造船有限公司船坞工程的锚拉式板桩坞壁结构监测成果进行分析研究,发现坞壁位移的主要原因是施工期墙前土体的蠕变变形。根据分析研究结果,在#2船坞接长改造工程中,采用了设置临时钢支撑、改进锚碇结构等措施,有效地减少坞壁位移,同时使锚碇施工工序不影响坞室开挖工序,提高了效率,保证了施工质量,达到了预期目标。设置临时钢支撑限制坞壁位移的方法在船坞工程中首次使用,为同类工程设计积累了经验。The analysis and study of the anchored sheet pile retaining wall of the Waigaoqiao Shipbuilding Co.dock engineering show that the creep deformation in front of the wall during construction is the major cause of the dock wall displacement.According to the results,several improved methods were taken in the expansion project of 2nd dock,including temporarily setting steel support,improving the anchored structure design,etc.,so that the dock wall displacement was effectively reduced and the dock excavation process was not influenced by the anchorage construction process.The method of temporarily setting steel support to reduce the dock wall displacement was firstly used in the dock project and it has accumulated significant experience for the similar projects design.

关 键 词:船坞工程 锚拉式板桩坞壁结构 位移 

分 类 号:U673.33[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象