检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南交通职业技术学院公路学院,湖南长沙410004 [2]广西柳工机械股份有限公司中央研究院压路机研究所,广西柳州545007
出 处:《筑路机械与施工机械化》2011年第1期70-72,共3页Road Machinery & Construction Mechanization
摘 要:结合某特大桥预应力体系与设置,以及竖向预应力粗钢筋组成的实例,对其应用技术、施工工艺、施工处理措施及质量控制进行介绍,并对该类桥梁结构中竖向采用无粘结预应力高强粗钢筋的受力性能、抗裂性能、安全可靠性与有粘结预应力进行比较。指出采用无粘结预应力同样能满足设计要求,且施工简便,进度快。According to the prestressed system and settings, and the example of vertical prestressed crude steel of certain cable-stayed bridge, the applied technology, construction process, treatment measures and quality control are introduced. At the same time, the mechanical behavior, crack resistance, safety and reliability of bridge structure using unbound prestressed crude steel are compared with using bound prestressed force. It is pointed out that unbound prestressed force also can meet the design requirements; make construction simple; accelerate construction speed, and save project cost.
分 类 号:TU757.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94