检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈静[1]
机构地区:[1]河北软件职业技术学院智能工程系,河北保定071000
出 处:《煤炭技术》2011年第1期125-127,共3页Coal Technology
摘 要:群桩沉降计算是一个传统课题,对群桩的沉降计算方法也有很多,但是计算结果与实测结果相比相差很大。本文利用等代墩基法和三维弹性有限元法对保定一高层建筑进行沉降量计算,并结合保定地区地层地质特点与实测结果进行比较分析。Settlement of pile groups is a traditional subject, the method for settlement of pile grqups, there are many, but the results varied widely compared with the measured results. In this paper, and so on behalf of the pier base method and three-dimensional elastic finite element method, Baoding, a high-rise building for settlement calculations, combined with a number of stratum Baoding surrounding geological features were compared with measured results
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28