检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国给水排水》2011年第2期61-64,共4页China Water & Wastewater
摘 要:吴江污水处理厂设计规模为8.5×104 m3/d,已建一期工程为1×104 m3/d、二期为2.5×104 m3/d,三期扩建规模为5×104 m3/d,该工程以一、二期工程作为参考,同时借鉴相关工程的设计经验,对各构筑物的设计参数进行了优化。采用脱氮除磷效果较好的倒置A/A/O工艺,介绍了其工艺流程、工程设计参数、设备配置等情况。The design capacity of Wujiang Sewage Treatment Plant is 8.5 ×10^4m3/d, in which the capacities of first- and second-stage projects are 1×10^4m3/d and 2.5 ×10^4m3/d respectively, and the capacity of third-stage expansion project is 5 ×10^4m3/d. With the first- and second-stage projects and other design experience as reference, the design parameters of every structure are optimized in the third-stage expansion project. The inverted A/AZO process is used for its better nitrogen and phosphorus removal efficiency. The process flow, design parameters, device configuration and so on are introduced.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.241.63