检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张克存[1] 屈建军[1] 牛清河[1] 姚正毅[1] 韩庆杰[1]
机构地区:[1]中国科学院寒区旱区环境与工程研究所敦煌戈壁荒漠生态与环境研究站/沙漠与沙漠化重点实验室,甘肃兰州730000
出 处:《中国沙漠》2011年第1期16-20,共5页Journal of Desert Research
基 金:国家自然科学基金项目(40701171;40930741);中国科学院重要方向性创新项目(KZCX2-YW-329)共同资助
摘 要:对青藏铁路沿线阻沙栅栏的流场结构、阻沙效率进行风洞模拟实验,对沱沱河路段阻沙栅栏的野外积沙形态进行观测。结果显示,气流经过栅栏时有遇阻抬升、集流加速、减速沉降区和消散恢复区。在越过栅栏后形成两个减速恢复区和两个加速区,减速区分别距地表3 cm和20 cm处,加速区分别位于近地表和35 cm高度处。随来流风速的增加,栅栏前加速区起始范围向栅栏逼近,而栅栏后恢复区起点向远离栅栏方向发展。当气流越过栅栏后风速急剧降低,导致沙粒减速沉降。随进口风速的增加,栅栏间阻沙量和越过栅栏后输出沙量呈指数关系递增。铁路沿线采用的栅栏阻沙效率达80%以上,且随风速的增加呈线性关系递减。沱沱河路段阻沙栅栏西南侧以风蚀为主,最大风蚀深度达16.7 cm,其余区域表现为积沙,最大积沙厚度达19.9 cm。The flow fields,protective efficiency of sand-blocking fences are simulated in wind tunnel experiment,and the erosion or accumulation phenomena of fences along the Qinghai-Tibet Railway in the section of Tuotuohe River region are observed in situ.There exists blocked-rising,collected-accelerating,decreased-depositing and diffused-restoring regions when airflow traverses sand-blocking fences.Two decreased-restoring regions as well as two accelerating regions present behind the fences.The decreased-restoring regions happen at the height of 3 cm and 20 cm above the earth surface,and the two accelerating regions happen within near surface and at the height of 35 cm above the earth surface,respectively.As the inlet wind speed increases,the wind accelerating range before fences approaches the fences and the starting point of wind-restoring region departs away fences.Wind speed abruptly decreases just after fences,which leads sand grains to deposit in this region.Sand-blocking mass and sand transport after fences increase exponentially with wind speed.Fence exerts distinct effect with sand-blocking ratio of over 80% along Qinghai-Tibet Railway.Sand-blocking ratio decreases linearly with wind speed.Wind erosion occurs on the southwest area of sand-blocking fence in the section of Tuotuohe River region,with the most wind-erosion depth of 16.7 cm,and it represents sand burial over the other areas and the most sand-accumulation depth is 19.9 cm.
分 类 号:U216.41[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42