检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交上海三航科学研究院有限公司,200032 [2]中交第二公路勘察设计研究院有限公司
出 处:《混凝土与水泥制品》2011年第1期43-46,共4页China Concrete and Cement Products
摘 要:针对现有高压蒸养和免高压蒸养两种不同养护工艺生产的PHC管桩,本文开展了PHC管桩的预应力损失试验研究。采用两种不同的测试方法,系统地研究了不同养护工艺的PHC管桩放张、混凝土收缩徐变和钢棒松弛等各阶段的预应力损失,对比分析了养护工艺对PHC管桩预应力损失的影响,为准确计算其极限承载力提供了必要的试验依据,并验证了两种测试方法的准确性和可靠性。For two different existing curing processes of PHC pile production,which are the high-pressure steam curing and the atmospheric steam curing,the experimental research on the prestressed loss of PHC piles is carried out.Through two different testing methods,the prestressed losses of PHC piles by different curing processes during each stage in the production processes,such as pile tension,concrete shrinkage and creep and steel relaxation are systematically researched.In addition,comparative analysis on the impact of different curing processes on the prestressed loss of PHC piles is conducted,which not only provides a necessary experimental basis of calculating the ultimate bearing capacity,but also verifies the accuracy and reliability of these two testing methods.
分 类 号:TU525[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112