1000MW超临界燃煤机组气力输灰系统典型配置方式优化  

Optimization of the Allocation Mode in the Ash Conveying System in 1000MW Supercritical Fossil-fired Power Units

在线阅读下载全文

作  者:刘新华[1] 丁岩峰[1] 申珽 

机构地区:[1]中国电力科学研究院,北京100070 [2]河北兴泰发电有限责任公司,河北邢台054000

出  处:《电站辅机》2010年第4期1-4,共4页Power Station Auxiliary Equipment

摘  要:针对1000 MW燃煤机组电除尘器的运行特性,结合双套管气力输灰技术,对不同输灰系统设计及运行调试中出现问题进行了比较,提出了管道出力、系统出力、输送罐出力的概念。根据运行实践,将1000 MW燃煤锅炉机组电除尘器输灰系统归纳为两种典型设计,可使输灰系统的配置设计日趋标准化。In the light of the operation features of electric precipitator in 1000MW fossil-fired unit and combined with dual-tube socket technology,the problems occurred in different ash conveying systems and operations have been compared,and the pipeline capacity,system capacity and transfer tank capacity have been put forward in the paper.According to the practice,two typical designs of electric precipitator dry ash conveying system in 1000MW coal-fired unit have been generalized,which will make the ash conveying system standardized.

关 键 词:超临界 机组 气力输送 系统 配置 双套管 方式 优化 

分 类 号:TM621.73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象