检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《公路交通科技》2011年第2期97-102,共6页Journal of Highway and Transportation Research and Development
基 金:北京市教育委员会科技发展计划重点项目(KZ200710028014)
摘 要:围岩变形是隧道开挖过程中很重要的一项施工监控的指标,将聚类方法引入到具体的隧道开挖过程中,挖掘出影响变形速率的主导因素,从而为隧道施工过程中变形的控制决策提供参考。利用层次聚类对监测点进行分类,采用最小二乘法曲线拟合对相关数据进行预处理,再采用层次聚类法确定影响变形的主因素,并最终得出结论:开挖面距离与隧道埋深是决定变形的两个主要因素,对围岩的变形产生重要影响,得出的结果将反馈到具体的隧道开挖过程中指导后续施工。Deformation,a construction monitoring indicator,is of great importance to the process of tunnel excavation.The clustering method was introduced to the process of concrete tunnel excavation,with the purpose of digging the main factor which influence the deformation rate most to offer a decision-making reference of deformation control in tunnel construction.First,the monitoring points were classified through hierarchical clustering,and some relative data were preprocessed by using curve fitting with least square method.Then,the main factors which affect deformation rate were found out by using hierarchical clustering.It is concluded that distance to the excavation and depth are the main factors which effect tunnel deformation most.The result could be used as feedback to guide the construction process later.
关 键 词:隧道工程 主因素分析 层次聚类 变形速率 最小二乘法
分 类 号:U451[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15