检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]昆明理工大学,昆明650051
出 处:《科学技术与工程》2011年第3期598-601,共4页Science Technology and Engineering
摘 要:怒江电网2010年丰大运行方式下,外送联络线故障时,将导致部分怒江电网与南方电网主网解列,引发严重高频问题。通过仿真研究怒江地区的运行方式和外送能力,确定了计算所需的稳定判据,制定了高频切机方案的计算原则,根据计算原则制定了2010年丰大运行方式下的高频切机方案,并对制定的切机方案进行了适应性分析,最后建议将兰剑线上的外送水平控制在81.9MW以下。Under the 2010 high flow period of the Nujiang Electric Power Grid,when the outgoing connect line breaks down,part of the Nujiang Electric Power Grid will disconnect from the South China Power Grid,and heavy over frequency issue will be raised.Run mode and the outgoing ability of the Nujiang Electric Power Grid were researched by simulations.Stable criterion needed during calculation was confirmed.Computing principle of over frequency generator tripping project was formulated.Over frequency generator tripping project of the Nujiang Electric Power Grid in the 2010 high flow period was established according to the computing principle.In addition,adaptability analysis of the over frequency generator tripping project was performed.At last the paper suggests that the outgoing level on the Lanping-Jianchuan connect line be controlled beneath 81.9 MW.
分 类 号:TM712[电气工程—电力系统及自动化] TM743
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222