检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨开林[1]
出 处:《南水北调与水利科技》2011年第1期8-11,共4页South-to-North Water Transfers and Water Science & Technology
基 金:"十一五"国家科技支撑计划资助项目(2006BAB04A12)
摘 要:调水工程非恒定流计算分析的复杂性与边界条件的处理有很大关系。通过研究内节点边界条件的等效渠道处理新方法,除了分叉节点外,对于闸门、多功能自动调节堰井、调节池、泵站等节点,采用一段渠道数学等效的代替,用统一的标准数学模型描述,使渠网非恒定流计算问题规格化。The complexity of simulation of the unsteady flows in water diversion projects depends on how to describe their boundary conditions. This paper presented a new method for dealing with the boundary conditions of nodes. Using this new method, the gate, multi-function automatic adjustment weir-well and regulation pond as well as pumping station etc. can be replaced by an equivalent channel in mathematics except bifurcating nodes. As a result,the boundary conditions of the nodes can be described using a uniform standard mathematical model to make the computation of unsteadv flow to normalize.
分 类 号:TV68[水利工程—水利水电工程] TV133.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.225