基于模糊逻辑和A*算法的最短时间矿难救援  

The Shortest Rescue Time of Coal Mine Disaster Based on Fuzzy Logic and A* Algorithm

在线阅读下载全文

作  者:李新[1] 姜雷[1] 

机构地区:[1]重庆工程职业技术学院,重庆400037

出  处:《中州煤炭》2011年第1期3-4,49,共3页Zhongzhou Coal

摘  要:针对矿井灾害事故后的人员疏散和实施救援等问题,建立矿井巷道网络模型,给出一种在三维空间中进行搜索的启发式函数设计思路。根据该思路进行数据结构设计,以改进A*算法,并利用模糊逻辑的数据融合技术得到巷道的综合权值,将综合权值与改进的A*算法相结合,完成对矿井灾害应急救援最短时间的路径求取,加快了系统运算速度,提高了救援效率。Aiming at the problems of miners′ evacuation and rescue execution after the coal mine disaster,roadway network model of coal mine was set up,and a new design idea of heuristic function which can search in three-dimensional space was proposed.Using above idea,we can design the data structure to improve A*algorithm.It also utilizes the data fusion technology based on fuzzy logic to acquire the synthesis weight and combines the improved A*algorithm,with which the shortest time of search and rescue is taken.The method of search and rescue accelerates the computing speed of system,and improves rescue efficiency.

关 键 词:矿难救援 最短救援时间 模糊逻辑 A*算法 

分 类 号:TP18[自动化与计算机技术—控制理论与控制工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象