苏州地区某超高层建筑基础优化设计  被引量:12

Optimization design on the foundation of a super high-rise building in Suzhou

在线阅读下载全文

作  者:赵宝利[1] 

机构地区:[1]苏州工业园区设计研究院有限责任公司,苏州215021

出  处:《建筑结构》2011年第2期97-100,共4页Building Structure

摘  要:在苏州地区某超高层建筑结构的基础设计中,采用变刚度调平方法,对主楼桩基布置进行优化,可有效协调塔楼核心筒与外围框架柱间的差异沉降。采用灌注桩后注浆技术,既可确保桩基施工质量,又能提高单桩承载力,极大地发挥桩基承载的潜力。结合地区经验对JCCAD沉降计算值进行修正,使基础设计更加合理。分析了施工和使用阶段两种工况下的桩顶作用效应,认为合理利用水浮力以优化桩基础设计,对节约造价具有积极意义。In the foundation design of a super high-rise building in Suzhou,the adoption of variable rigidity design to optimize the pile layout of the main building was proved to be effective for the coordination of different settlement between the core tube and the frame column outside.The application of post-grouting technique for cast-in-situ pile could not only ensure the construction quality,but also raise the bearing capacity of each pile.By comparing with the empirical value of the actual engineering practice,revision was made in settlement calculation by JCCAD to make foundation design more reasonable.The analysis of action effect on pile top during construction and normal use has verified the significance of utilizing properly site groundwater buoyancy in pile foundation design for the purpose of saving project cost.

关 键 词:桩筏基础 灌注桩后注浆 压缩模量 差异沉降 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象