检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081
出 处:《水电勘测设计》2010年第3期5-9,共5页
摘 要:大花水拦河大坝为河床拱坝+左岸重力坝的组合坝型,拱坝最大坝高134.50m,重力坝最大坝高73m。拦河大坝稳定分析包含碾压混凝土拱坝和左岸重力坝,本文主要介绍大花水拦河大坝稳定分析在不同设计阶段中的分析情况。The abutment stability against sliding in the design of arch dam is vitally important. The rational stable sliding pattern and accurate load calculation can obtain the reliable safety factor of stability against sliding and ensure the safe operation of arch dam, and at the same time, too conservative will result in a waste of investment. In the calculation of stability against sliding, some noticeable questions of sliding pattern choose, slide block boundary condition determination, main load calculation and calculation result analysis are introduced based on the practice of some projects.
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.200.242