机构地区:[1]华东电力试验研究院有限公司,上海200437
出 处:《华东电力》2010年第12期1866-1868,共3页East China Electric Power
摘 要:介绍了换流变压器现场交接的试验项目,重点分析了换流变绝缘考核试验项目,对现场开展换流变绝缘考核试验的可行性和必要性进行了论证,提出了换流变现场交接绝缘考核中迫切需开展和推广的试验项目。On-site hand-over test items of converter transformer were introduced.The converter variable-insulation inspection test items of the converter transformer were emphatically analyzed.The feasibility and necessity of carrying out the on-site current converter variable-insulation inspection test were discussed.The test items that are urgently needed to be carried out and promoted in the on-site hand-over insulation inspection of the current converter were proposed.