机构地区:[1]上海市电力公司超高压输变电公司,上海200063
出 处:《华东电力》2010年第12期1920-1923,共4页East China Electric Power
摘 要:近年来,随着上海市政建设的快速发展,配合市政建设的部分线路需进行改造、增加杆塔,传统的线路停电改造施工的停电时间长,将影响系统安全运行。为此,对带电组立220 kV双回路双分裂(630导线)直线塔关键技术进行了论述,经某220 kV同塔双回线路上带电组立直线塔的实践表明,工艺合理、安全,施工装置合适、可靠。Recently,with the fast development of the Shanghai municipal construction,and in order to support the municipal construction,some lines need to be transformed and added with the towers.The outage time of the traditional line outage transformation operation is long,which affects the system safe operation of the system.Therefore,the key technologies of charged grouping 220 kV double-circuits twin bundled(630 conductors) line straight towers were discussed.The practices of the charged grouping the straight towers of one 220 kV double-circuits lines on the same tower demonstrated that the technologies were rational and safe and the operation equipments were suitable and reliable.
分 类 号:TM754[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145