500kV静安变电站辅控系统调试  

Debugging for the Auxiliary Control System of 500 kV Transformer Substation in Jingan

在线阅读下载全文

作  者:陈旭 

机构地区:[1]上海闸北发电厂,上海200438

出  处:《华东电力》2010年第12期2002-2004,共3页East China Electric Power

摘  要:简要介绍了500 kV静安变电站主、辅设备情况,重点介绍了辅助控制系统配置组成、调试中暴露的问题及整改效果,完善、提高了辅助控制系统联锁报警、保护系统及自动控制系统的可靠性,确保了500 kV地下变电站的安全、可靠运行。In this paper,the master equipments with their auxiliary devices in Jingan′s 500 kV transformer substation were briefly presented.The configuration of the auxiliary control system,the problems during debugging and the results after rectification was introduced in details.The reliabilities of the interlock alarm,system protection and automatic control system in the auxiliary control system were perfectly improved.Thus,this guaranteed the 500 kV underground transformer substation in a safe and reliable operation.

关 键 词:500KV地下变电站 辅助控制系统 调试 

分 类 号:TK323[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象