亭子口水电站厂坝间设置垫层管可行性研究  

Feasibility study on cushion pipes between dam and powerhouse of Tingzikou Hydropower Station

在线阅读下载全文

作  者:崔建华[1,2] 苏杰[1] 祁勇峰[1,2] 

机构地区:[1]长江科学院材料与结构研究所,湖北武汉430010 [2]水利部水工程安全与病害防治工程技术研究中心,湖北武汉430010

出  处:《水利水电科技进展》2011年第1期50-53,共4页Advances in Science and Technology of Water Resources

基  金:中央级公益性科研院所基本科研业务费(YWF0908);水利部公益性行业科研专项(200901066);"十一五"国家科技支撑计划(2006BAB04A01);国家自然科学基金(50539010)

摘  要:为研究亭子口水电站厂坝间设置垫层管的可行性,以厂房坝段、厂房以及钢管为研究对象,采用三维有限元仿真计算技术模拟厂房坝段以及厂房的浇筑和运行过程,计算得到厂坝间相对位移及垫层管段钢管等效应力。计算结果表明,厂房蜗壳内设置止推环时,运行期高温季节垫层管的等效应力将大于钢材允许应力,如果采用垫层管方案,需采取必要的结构或工程措施以减小垫层管段的应力。In order to study the feasibility of setting up a cushion pipe between the dam and the powerhouse of Tingzikou Hydropower Station,the dam,the powerhouse and the steel pipe were discussed.By use of 3D FEM simulation, the concrete placing process of the dam and powerhouse was simulated.The relative displacement between the dam and the powerhouse and the equivalent stress of the cushion pipe were calculated.The results indicate that the equivalent stress of the cushion pipe is larger than its allowable stress in hot season if the thrust ring is set in the spiral casing.In order to reduce the stress of the cushion pipe,some structural or technical measures should be taken when the cushion pipe is used.

关 键 词:三维有限元法 垫层管 止推环 亭子口水电站 

分 类 号:TV732.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象