作 者:谢德勇
机构地区:[1]广东大唐国际潮州发电有限责任公司,广东潮州515723
出 处:《广东电力》2011年第1期91-94,共4页Guangdong Electric Power
摘 要:潮州发电厂3、4号锅炉在调试期间出现低负荷阶段水冷壁超温的现象,严重时达到500℃以上。通过分析水冷壁热负荷分布和燃烧器投运原则,认为水冷壁管节流孔圈直径偏小导致通流量减小、燃烧器投入顺序不合理造成锅炉下部水冷壁吸热量增大是产生水冷壁超温的主要原因。为防止水冷壁超温,提出优化制粉系统投运方式、调整燃烧方式、合理控制煤水比、加强节流孔圈检查等措施。潮州发电厂采取温度控制措施后,水冷壁超温次数大大较少。The water wall overheat,which exceeds 500℃ in severe cases,occurs in low load conditons during the commissioning of No.3 and No.4 boilers in Chaozhou power plant.By analysis of heat load distribution of water wall and commissioning principle of burner,it is believed that the decreased water flow caused by smaller throttle orifice diameter and increased heat absorption capacity of water wall by unreasonable burner input sequence are major reasons for water wall overheat.For preventing water wall overheat,optimization of pulverizing system commissioning test,adjustment of combustion method,reasonable proportion control of coal and water,strengthening inspection on throttle orifice and other measures are proposed.The overheat frequency of the water wall becomes drastically lower after the adoption of temperature control measures in Chaozhou power plant.
分 类 号:TK223.31[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127