浅埋偏压小净距隧道开挖顺序研究  被引量:3

Research on Excavation Sequence of Shallow-depth Unsymmetrical Loading Small Spacing Tunnel

在线阅读下载全文

作  者:王建华[1] 陈力华[1] 张蕾[2] 

机构地区:[1]招商局重庆交通科研设计院有限公司,重庆400067 [2]中国人民解放军后勤工程学院军事建筑工程系,重庆401311

出  处:《公路交通技术》2011年第1期99-101,共3页Technology of Highway and Transport

基  金:重庆市自然科学基金(CSTC;2009BB6226)

摘  要:采用改进的有限元强度折减法计算某浅埋偏压小净距隧道2种开挖方式在各个施工阶段的安全系数大小。比较这些安全系数,找到2种开挖方式在整个开挖过程中最容易产生破坏的施工步,得出浅埋偏压小净距隧道先开挖深埋侧可避免出现较危险的施工状态这一结论,希望对研究对类似工程的施工具有一定的指导意义。The modified FEM Strength Reduction Method is adopted to calculate the safety factors of two excavation modes during various construction phases in some shallow-depth unsymmetrical loading small spacing tunnel. By comparing these safety factors, this paper finds out the construction steps that are easiest to be damaged by the above two excavation modes during excavation, and draws a conclusion that excavating deep-buried side first of the shallow-depth unsymmetrical loading small spacing tunnel can avoid occurrence of dangerous construction states in hope of providing a certain guidance for research on construction of similar projects.

关 键 词:开挖顺序 有限元强度折减法 安全系数 

分 类 号:U459.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象