检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李剑锋[1]
出 处:《电力建设》2011年第1期108-112,共5页Electric Power Construction
摘 要:火电厂是资金密集型和技术密集型企业,火电工程建设要求高,难度大。火电工程实行工程总承包,可以充分发挥总承包企业的设计、采购、施工等的协同管理优势,最大限度满足业主的需求。文章结合梅山电厂EPC(Engineering,Procurement,Construction)项目管理实践,分析了火电工程总承包的项目管理策略,阐述了总承包项目管理的重点和主要管理内容,为提高项目管理水平和总承包商的市场竞争能力提供参考。Coal-fired power plants are resource-intensive and technology-intensive enterprises.Construction of a coal-fired power project involves high requirements and difficulties.For general contracting of such projects,the general contractor can bring into full play of the advantages of coordinated management of engineering,procurement,and construction,and satisfy the owner's demands to the maximum extent.Based on the management practice of Meishan Power Plant EPC(Engineering,Procurement,Construction) Project,this paper analyzes the project management strategy for general contracting of coal-fired power plants,and describes the key management points and main contents for general contracting project,thereby providing a reference for improvement of project management level and the market competitiveness of the general contractor.
关 键 词:火电工程 电厂 工程总承包 EPC(Engineering Procurement Construction) 项目管理 管理实践
分 类 号:TM621.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.169