作 者:李君章[1,2] 秦江坡[2] 杨作强[2] 郑晓广[2]
机构地区:[1]武汉大学经济管理学院,武汉市430072 [2]河南送变电建设公司,郑州市450051
出 处:《电力建设》2011年第1期117-120,共4页Electric Power Construction
摘 要:邻近带电线路组立铁塔施工给输电工程铁塔组立带来很多不便和安全隐患。采用内悬浮外拉线抱杆进行组塔施工时,临近带电线路组塔对其上拉线和吊件控制绳的布置有较大影响。通过计算拉线与临近电力线路的安全距离,细化输电铁塔组立施工计算模型,总结在多个邻近带电线路工程中采取的内悬浮外拉线抱杆组塔施工技术措施,为其他的邻近带电线路组立铁塔提供参考。It is very inconvenient and unsafe to assemble towers adjacent to power line.When towers are erected by inside suspension pole with outside pulling wires,the adjacent power line will significantly affect the layout of outside pulling wires and the control ropes for lifting.By calculating the safe distance between the outside pulling wires and the adjacent power line,the calculation model for tower assembling construction is further refined.The paper summarizes the technical measures taken in many projects for assembling towers adjacent to power lines by inside suspension pole with outside pulling wires,which can be used as a reference for similar projects.
关 键 词:邻近带电线路 内悬浮外拉线抱杆 上拉线 吊件控制绳 组塔技术 安全距离 组塔施工模型 技术措施
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.4.109