检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张永良
机构地区:[1]天津蓝巢特种吊装工程有限公司,天津市300308
出 处:《电力建设》2011年第2期127-129,共3页Electric Power Construction
摘 要:火电厂发电机定子是火电机组单件最重的设备,它的吊装就位具有施工空间狭小、周围架构及设备密集、对项目工期影响大及施工难度大等特点。文章设计了一套能应用于300~1000MW火电机组发电机定子的吊装系统,该系统借用汽机房天车主梁结构强度和大车行走机构,利用专用架构和液压提升装置吊装发电机定子,具有所需空间小、施工工艺简单、安全可靠、对汽机房内的架构和其他设备安装要求底等特点。The generator stator is the heaviest single equipment in a thermal power plant and its hoisting has such characteristics as narrow construction space,high density of structures and facilities surrounding it,large impacts on project schedule and high construction difficulty.This article introduces a hoisting system dedicated for the generator stator of 300~1 000 MW coal-fired units,which takes advantage of the strength of main girder of EOT crane in TG hall and the running mechanism,and makes use of a specialized structure and hydraulic lifting device to lift the generator stator.This system needn't large space and is simple in construction technology,reliable in safety and low in requirement for structures and other facilities in the TG hall.
关 键 词:1000MW超超机组 发电机定子 天车 液压提升装置 吊装 施工工艺
分 类 号:TM621.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227