村庄下开采方案浅析  被引量:1

Under Village Mining Method Analysis in Hebi no.2 Coal Mine

在线阅读下载全文

作  者:陈磊[1] 张彦宾[1] 呼庆华[1] 

机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454003

出  处:《科技信息》2011年第1期I0374-I0375,共2页Science & Technology Information

摘  要:为了充分回收村庄下的煤炭资源,缓解煤矿采掘紧张的矛盾以及延长矿井的服务年限,决定鹤壁二矿的鹤壁集东部保护煤柱预以回收。根据矿区的地质条件和岩层与地表地动机理,对该村庄下的煤炭回收提出了不同的开采方案.通过经济技术的优化,选择合理的开采方案,有效的控制了地表变形。地面建筑物采取了一些加固维修及拆迁补偿等措施。最大限度的回收了村庄下压煤,延长了矿井服务年限,创造了良好的经济效益和社会效益。In order to fully exploit the mine under the village, relief the busy extract and tunneling of the coal, to decide recover the east coal pillar under Hebi village. Based on the geological condition of mining area ,rock and surface move mechanism ,to proposed different minings under the village. Through the Optimization of economy and technique ,choose the reasonable the recover mining. The surface move to get effective control. The surface building to adopt same reinforcement repair measures and compensation for demolition. The maximum amount of recover the village mine, extend the time of the extract. To create well economic benefit and social benefit.

关 键 词:村庄下压煤 开采方案 保护煤柱 变形预计 

分 类 号:TD325[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象