检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张全刚[1] 翟林甫[1] 李印长[1] 龙广超[1]
出 处:《金属制品》2011年第1期76-78,83,共4页Metal Products
摘 要:用ML20MnTiB替代ML40Cr作为冷镦钢盘条,以减少冷镦前退火处理工序。介绍ML20MnTiB盘条化学成分及轧制工艺流程,斯太尔摩线长度104m,盘条在斯太尔摩线上的运行时间由290s提高到373s,在保温罩内的运行时间由179 s增加到271s,在保温罩内的平均冷却速度由0.44℃/s降到0.38℃/s。工艺调整后,盘条屈服强度和抗拉强度均降低约30~40 MPa,组织全部为铁素体加珠光体,心部不存在粒状贝氏体,心部晶粒度由8.5级增大到7.5级,1/3冷镦合格率由原来的75%提高到100%。Annealing treatment process before cold heading is reduced while ML40Cr is replaced by ML20MnTiB to act as cold heading steel wire rod. ML20MnTiB wire rod rolling process flow and chemical composition are introduced. Stelmor line length is 104 m, running time of wire rod on Stelmor line is increased from 290 s to 373 s, running time in heat holding cover is increased from 179 s to 271 s. The average cooling speed in heat holding cover is decreased from 0.44℃/s to 0.38℃/s. The yield strength and tensile strength of wire rod are decreased about 30 -40 MPa after process adjusting. Structure are ferrite and pearlite, there is no granular bainite in center. Central grain size is larged from grade 8.5 to grade 7.5. 1/3 cold heading pass percent is increased from 75% to 100%.
关 键 词:ML20MnTiB 控冷工艺 冷镦钢 斯太尔摩线
分 类 号:TG335.63[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3