检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电》2011年第2期11-14,共4页Water Power
摘 要:向家坝水电站地下厂房系统规模巨大,地质条件复杂。在大量科研工作的基础上,确定了地下洞室群,尤其是主厂房的施工程序和支护参数。建设过程中进行了严格的施工管理和作业控制,建立了集设计、科研、施工于一体的实时监测动态分析反馈系统。向家坝水电站工程实践中形成的设计、施工和项目管理原则和程序,可对类似工程起借鉴作用。The underground powerhouse system of Xiangjiaba Hydropower Station has a huge scale and complex geological conditions. Based on a large number of studies, the construction procedures and supporting parameters for underground caverns, especially the main powerhouse, are determined. The strict managements and controls are adopted in the construction and the real-time monitoring and dynamic analysis system which integrating design, research and construction are established. The principles and procedures on design, construction and management can be as reference to constructing similar projects.
分 类 号:TV731.6[水利工程—水利水电工程] TV511
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222