检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉工程大学环境城市建设学院,湖北武汉430074 [2]新疆和合矿业有限责任公司,新疆和静813200
出 处:《武汉工程大学学报》2011年第2期89-91,共3页Journal of Wuhan Institute of Technology
基 金:国家自然科学基金资助项目(51054005)
摘 要:针对厚大、缓倾斜、顶板基本稳定的磷矿床,在使用房柱法开采过程中顶板容易跨冒的特点,本文探索性地提出了设置电耙底部结构、溜井振动放矿的房柱采矿方法.通过这些改进,将可以避免人员直接在较大的暴露空场下作业,减少安全事故的发生,同时盘区生产能力和回收率可以得到较大幅度的提高,电耙和窄轨电机车运输系统等常规设备的大量使用可以节省投资.Gentle slope and big phosphate deposit with stable roof is mined by way of room and pillar, the roof cocrupt ocuurs easily, room and pillar mining is presented with the bottom of electric scraper and vibro-drawing of drop shaft. With these improvements, it is avoided that worker is direct in the larger void field, which it also can reduce security incidents, while panel production capacity and recovery rate can be increased largely, A lot of investment can be saved due to using electric scraper and narrow-gauge electric locomotive transport system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.162.18