检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘春[1]
出 处:《隧道建设》2011年第1期18-20,共3页Tunnel Construction
摘 要:介绍采用小直径开敞式TBM进行超前平导施工的意义、目的和国外采用小直径TBM进行超前导洞施工的实例;分析国内采用小直径开敞式TBM进行超前导洞施工的可行性;总结进行超前导洞施工时选择开敞式TBM的考虑因素。得出以下结论:利用小直径开敞式TBM进行长大隧道超前导洞施工,符合国家对基本建设的环保和安全的要求;当前的综合国力和施工技术水平也具备了相应的条件;选择小直径TBM时应考虑其特点,并满足"快速掘进、探明地质、支持正洞"的要求。The significance and targets of pilot tunnels constructed by small-diameter open TBMs are presented,cases of pilot tunnels constructed by small-diameter open TBMs abroad are listed,the feasibility to build pilot tunnels by small-diameter open TBMs is analyzed and factors to be considered in the selection of small-diameter open TBMs in the construction of pilot tunnels are summarized.Conclusions drawn are as follows: 1) The concept to build pilot tunnels by small-diameter open TBMs meets the requirements of the state for the infrastructure construction in terms of environment protection and safety;2) The comprehensive national capability and the construction technologies have reached the relevant requirements;3) The features of small-diameter open TBMs should be taken into full consideration and the requirements of rapid boring,geology probing and assistance to the main tunnel construction should be satisfied.
关 键 词:平导施工 小直径开敞式TBM 长大隧道 超前导洞
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117