检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘枫[1] 刘军进 朱礼敏[1] 张海 冉启件 张文胜
机构地区:[1]中国建筑科学研究院,北京100013 [2]上海江河幕墙系统工程有限公司,上海201601
出 处:《建筑结构》2011年第3期11-13,35,共4页Building Structure
基 金:国家科技支撑计划资助(2006BAJ01B04)
摘 要:对中国航海博物馆曲面幕墙单层索网结构进行了张拉施工模拟分析,采用合适的分级张拉方案,最终实现了以初始状态为基础、以终态找形结果为目标的过程模拟。介绍了初始状态的确定方法,在其基础上,采用3种张拉方案进行施工模拟分析,介绍了施工模拟的步骤和具体实现方法,对3种方案进行综合比较,推荐采用横竖索混合张拉方案,以确保张拉精度。Construction simulation analysis on single-layer double curve cable-net curtain wall of China Maritime Museum means adopting suitable prestress construction plan to realize the process simulation based on the initial status and final form-finding result.The confirmation method for the initial status was introduced.Three tension plans were used to make the construction simulation.Simulation steps and method were presented.Synthetical comparison among three plans was made.The plan with mixing tension of vertical and horizontal cables was recommended to ensure the construction precision.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229