汛期分期定量分析方法在汤河水库中的应用研究  被引量:7

Application of Quantitative Analysis Methods of Stage Flood Period to Tanghe Reservoir

在线阅读下载全文

作  者:王丽学[1] 孙晓东[1] 李学森[2] 王丽娜[1] 刘永鹏[1] 

机构地区:[1]沈阳农业大学水利学院,辽宁沈阳110866 [2]汤河水库管理局,辽宁辽阳111000

出  处:《水电能源科学》2011年第3期44-47,共4页Water Resources and Power

摘  要:针对水库汛期具有确定性、随机性、过渡性的变化特征,结合汤河水库汛期洪水变化规律,在分析数理统计法、模糊集合分析法、层次聚类法的基本原理及各自优缺点的基础上,分别应用3种方法研究了汤河水库汛期分期规律。综合考虑3种方法分析结果及该水库原有汛期分期方案,确定汤河水库优化汛期分期方案为:6月1日~7月20日为前汛期;7月21日~8月20日为主汛期;8月21日~9月10日为后汛期。Flood has characteristics of determinacy,randomicity and transition.Based on the analysis of the basic principle of mathematics statistics,fuzzy set analysis,hierarchy cluster analysis and their advantages and disadvantages,the paper applies three methods to study the variation rule of stage flood period for Tanghe Reservoir.Considering the results of these methods and the original program of the reservoir,optimal stage flood period scheme of Tanghe Reservoir is obtained: the antecedent flood period is between June 1st and July 20th;the main flood period is between July 21st and August 20th;the post flood period is between August 21st and September 10th.

关 键 词:汤河水库 汛期分期 数理统计法 模糊集合分析法 层次聚类法 

分 类 号:TV697.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象