检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京京水建设工程有限责任公司,102300 [2]三峡大学,湖北宜昌443002
出 处:《北京水务》2011年第1期40-43,共4页Beijing Water
摘 要:在最不利工况下,选用合理的单元对渡槽进行结构计算,得到的节点应力和位移云图显示了槽身出现最不利变形和最大拉、压应力的位置。结果表明:槽身的后浇带处、主梁支座钢绞线附近、两侧边墙与底板连接处的变形比较严重。另外还将计算结果与槽体内埋设的精密安全监测仪器所测的数据进行对比,其结论对类似工程的设计和施工有重要的参考意义。Based on the most unfavorable conditions,the paper analyzed the structure calculation on a reasonable structure of the aqueduct unit. The node stress and displacement diagram displayed the position on the body where the most unfavorable deformation and the maximum compressive stress exist. The results showed that the serious distortion occurs in the body of post-cast strip,the bearing steel girder nearby,the joints of the sidewalls and slab. This paper also compared the calculated results and the data measured by the precise monitoring instruments buried in the aqueduct ,the conclusion has an important guiding significance for the design and construction of the similar engineering.
分 类 号:TV672.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28