Comprehensive test stand for high-intensity cyclotron development  被引量:3

Comprehensive test stand for high-intensity cyclotron development

在线阅读下载全文

作  者:ZHANG TianJue LI ZhenGuo CHU ChengJie XING JianSheng GUAN FengPing ZHONG JunQing JI Bin GE Tao YIN ZhiGuo HOU ShiGang PAN GaoFeng YAO HongJuan LU YinLong WANG ZhenHui WU LongCheng LIN Jun JIA XianLu WEI SuMin WEN LiPeng WANG Feng XIA Le CAI HongRu XIE HuaiDong CHEN RongFan ZHANG Yan ZHANG SuPing LIU GengShou ZOU Jian AN ShiZhong YANG JianJun BI YuanJie YANG Fang 

机构地区:[1]China Institute of Atomic Energy, Beijing 102413, China

出  处:《Chinese Science Bulletin》2011年第3期238-244,共7页

基  金:supported by the National Natural Science Foundation of China (10775185,10805080)

摘  要:A comprehensive test stand for high-intensity cyclotron development,a 10 MeV 430 μA cyclotron,has been successfully constructed at China Institute of Atomic Energy (CIAE) for the experimental verification of the viability of a 100 MeV high-intensity cyclotron (CYCIAE-100) being constructed at CIAE.The verification includes the overall design technology,detail design and engineering technology for the crucial parts of the machine,e.g.main magnet and beam diagnostics.It will also pave the way for future enhancement of the beam intensity.The test stand consists of a H-ion source,axial injection system,central region,main magnet and coil,RF resonator,stripping extraction,and auxiliary systems,which include the RF power amplifier,high voltage and DC power supplies,electric apparatus,beam diagnostics,control,vacuum,water cooling,pneumatic system,and safety interlock.This paper presents the work regarding the design and sub-system development of the test sand,and the results of the beam commissioning of the machine.A comprehensive test stand for high-intensity cyclotron development, a 10 MeV 430 uA cyclotron, has been successfully con- structed at China Institute of Atomic Energy (CIAE) for the experimental verification of the viability of a 100 MeV high-intensity cyclotron (CYCIAE-100) being constructed at CIAE. The verification includes the overall design technology, detail design and engineering technology for the crucial parts of the machine, e.g. main magnet and beam diagnostics. It will also pave the way for future enhancement of the beam intensity. The test stand consists of a H- ion source, axial injection system, central region, main magnet and coil, RF resonator, stripping extraction, and auxiliary systems, which include the RF power amplifier, high voltage and DC power supplies, electric apparatus, beam diagnostics, control, vacuum, water cooling, pneumatic system, and safety inter- lock. This paper presents the work regarding the design and sub-system development of the test sand, and the results of the beam commissioning of the machine.

关 键 词:回旋加速器 高强度 试验台 原子能科学研究院 射频功率放大器 中国科学院 轴向注入系统 工程技术 

分 类 号:TL542[核科学技术—核技术及应用] TG133[一般工业技术—材料科学与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象