检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长春市新立城水库管理局,吉林长春130119
出 处:《吉林水利》2011年第3期10-13,共4页Jilin Water Resources
摘 要:新立城水库土坝坝基属于双层地基,即表层为粘性土层,下面为沙砾石层。坝基下砾质粗砂和细砾为强透水层,连续分布。因需要防渗的透水层不厚(仅2~5m),采用高压喷射灌浆封堵透水层。施工前选定与坝段同样地质条件的试验场,用实际施工的喷灌设备分不同方案进行原型试验,开挖后观察成墙效果,最后确定施工技术参数。The foundation of Xinlicheng Reservoir Earth Dam is consisting of double layers,that is the surface is clay layer and below the gravel layer.Coarse sand and gravel and fine gravel are the high permeable layer with continuous distribution.Because the seepage control layer from Impervious to pervious layer is not thick(only 2-5m),high pressure jet grouting to plug the permeable layer is used.The test field is selected with the same geological condition as the dam before construction,the actual construction irrigation equipment is applied at the prototype test under various options,and the cut-off wall was observed after excavation,then the final parameters of construction technology are determined.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.253.148