检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江水利委员会水文局长江上游水文水资源勘测局,重庆400014
出 处:《人民长江》2011年第6期35-37,共3页Yangtze River
摘 要:乌江流域是我国重要的水电能源基地之一,流域内已建或在建有多座梯级水电站。这些水电工程的建设,改变了流域的局部水文特性,导致洪水传播时间和降雨的产汇流时间缩短,给流域的水文预报增加了困难。鉴于此,在分析流域暴雨洪水特性和原有洪水预报方案的基础上,深入研究了流域内各主要水电站对洪水预报的影响,针对实际情况调整预报方法,并找出预报的难点和疑点。通过对2010年7月9日乌江洪水预报实践表明,调整后的预报方案能够取得较为满意的预报结果。Many cascade hydropower stations are in operation or being constructed in Wujiang River watershed,which is one of the significant hydropower energy bases in China.The construction of these hydropower stations changed the local hydrological characteristics of the basin,and shortened the duration of interval flood transmission and runoff yield and confluence,therefore,basin hydrological forecasting is more difficult.In view of this,we further study the influences of the main hydropower stations on the hydrological forecasting on the basis of analyzing basin flood characteristics and the original flood forecasting scheme.By adjusting forecasting method according to the actual situation,we successfully forecasted the flood of Wujiang River on July 9th,2010.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117