煤层气试验井组开发阶段关键问题探讨  

Discussion on Key Problems in the Development Stage of CBM Testing Well Group

在线阅读下载全文

作  者:谢学恒[1] 王宁[1] 郝春明[1] 龙毅[1] 

机构地区:[1]中国石化华东分公司勘探开发研究院,江苏210036

出  处:《中国煤层气》2011年第1期26-28,36,共4页China Coalbed Methane

摘  要:在煤层气试验井组的开发阶段,为了增产或稳产,需要运用煤层气藏工程,对开发的关键问题,如气藏饱和状态、排采效果、解吸压降漏斗演变、井型选择及井网调整等,进行有效地分析评价。本文在煤层气藏工程的基本理论基础上,结合具体实例,给出了对一煤层气井组开发阶段关键问题的探讨思路,相比于非系统化的分析,可以更好地应用于实践。During the development stage of CBM testing well group, in order to increase or stabilize the production, CBM reservoir engineering project should used to effectively analyze and evaluate the key problems for development, including the saturation condition of the reservoir, the production effect, the evolution of desorption pressure drop funnel, the selection of well type, the adjustment of well pattern, etc. Based on the theory of CBM reservoir engineering and practical examples, the paper provide the train of thought on the key problems in the development stage of a CBM testing well group. Compared with some non-systematic analysis, the thought can be better applied in practice.

关 键 词:煤层气 饱和状态 排采效果 压降漏斗 井网调整 

分 类 号:TD845[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象