检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宁夏电力公司电力科学研究院,宁夏银川750011 [2]宁夏电力公司石嘴山供电局,宁夏石嘴山753600
出 处:《宁夏电力》2011年第1期26-30,共5页Ningxia Electric Power
摘 要:在宁东~山东±660 kV直流输电示范工程银川东换流变电站330 kV交流场带电前,针对交流线路的充电功率是否导致工频过电压,以及交流滤波器和并联电容器在投切换入过程中是否产生操作过电压,进行了仿真计算。计算结果表明,各条线路均可作为该换流站的带电启动线路,且单独投入滤波器或电容器时产生的过电压不会对系统产生较大影响。Before electrifying 330 kV alternating current(AC) field of Yinchuan Eastern converter station of Ningdong to Shandong ±660 kV DC power transmission demonstration project,in order to know whether the charging power of AC transmission lines will lead to AC frequency overvoltage,and whether when switching the AC filter and shunt capacitor will produce operation overvoltage,makes the system simulation,the result shows every line can all be the electrifying startup line of this converter station,the overvoltage switching the AC filter and shunt capacitor will not bring big influence for the power system.
分 类 号:TM866[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.176.168