青岛某工程35kV变电站边坡渗漏的治理  

Leakage Control of 35kV Slope Substation Project in Qingdao

在线阅读下载全文

作  者:赵红军 刘晓英 朱桐昕 

机构地区:[1]青建集团股份公司,青岛266071

出  处:《青岛理工大学学报》2010年第6期100-102,共3页Journal of Qingdao University of Technology

摘  要:青岛某工程35 kV变电站场地周边环境及水文地质条件复杂,紧邻海边.施工中支护桩锚杆在钻孔施工穿过旋喷桩止水帷幕后,造成海水不断冲塌上部淤泥层及下部粉砂层,从而导致海水从锚杆部位冲出,发生渗漏现象.施工中有针对性地分别采用背水面注浆法及迎水面补强水泥帷幕桩的施工方法,取得了良好的效果.The perimeter environment and hydro-geological conditions are complex in a 35 kV substation project,close to the sea,in Qingdao.After the anchorage branched piles bored through the rotating pile waterproof curtain in construction,the sea water crushed the upper silt layer and the lower siltstone layer and caused them to collapse,as a result,the sea water flowed out from the anchor and the leakage occurred.It's very effective to use the construction method of the negative side water fill grouting and water attaining surface pile repair.

关 键 词:深基坑 补桩法 渗漏治理 

分 类 号:TU753.66[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象