检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗福安[1] 徐永年[1] 梁志勇[1] 王柏乐[2] 严军[2] 魏善淇 刘泽钧[3]
机构地区:[1]中国水利水电科学研究院,北京100044 [2]贵阳勘测设计研究院,贵州贵阳550002 [3]天生桥水力发电总厂,贵州兴义562400
出 处:《水利学报》1999年第11期12-19,共8页Journal of Hydraulic Engineering
摘 要:天生桥二级水电站首都枢纽的防沙工程充分利用天然河弯环流、人工环流及沉沙排沙等措施, 采用多级水位调度方式, 控制溯源冲刷,The inlet of the Tianshengqiao Second Cascade Hydropower Station is located at a river bend. To prevent sediment particles from entering the canal of the power station comprehensive measures including utilization of circulation flow in river bend, construction of submerged guide dike to form an artificial circulation, establish of settling basin as well as the operation scheme to reasonably control the water level are adopted. The measures are effective in prevent from the entering of coarse sand and reducing the wearing of the turbines.
分 类 号:TV74[水利工程—水利水电工程] TV673
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28