无粘结预应力混凝土平板开洞技术  被引量:2

Holing Technique of the Prestress without Bond Concrete Flat Slab

在线阅读下载全文

作  者:张玉明[1] 常万鹏[1] 张然[1] 赵谦 

机构地区:[1]北京市建筑工程研究院

出  处:《施工技术》1999年第12期20-22,共3页Construction Technology

摘  要:北京花乡工农业产品展销厅工程由于使用高度的要求,要对原1、2 层门厅双向无粘结预应力混凝土顶板沿四周梁边全部剔除,开洞8m ×7.45m 。本文从板底支撑系统的搭设、分段进行混凝土板剔除、预应力筋切断、放张、张拉端面加固处理、重新张拉等方面详细阐述了开洞的方法。In the project of Beijing Flower Village Industrial and Agricultural Product Exhibition and Sale Hall, due to the requirement of height, the two way prestress without bond concrete top slab of the entrance hall has to be rejected entirely along the beams all around on the primary first and second floors, with a 8m×7 45m hole. This paper details the holing method on the aspects of erecting of the plate bottom bracing system, rejecting of the concrete slab in sections, the cutting and relaxing of the prestressed reinforcement, treatment of tension end surface strengthening and restretching.

关 键 词:开洞工程 无粘结预应力 混凝土板 剔除 预应力筋 

分 类 号:TU757[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象