检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京市建筑工程研究院
出 处:《施工技术》1999年第12期20-22,共3页Construction Technology
摘 要:北京花乡工农业产品展销厅工程由于使用高度的要求,要对原1、2 层门厅双向无粘结预应力混凝土顶板沿四周梁边全部剔除,开洞8m ×7.45m 。本文从板底支撑系统的搭设、分段进行混凝土板剔除、预应力筋切断、放张、张拉端面加固处理、重新张拉等方面详细阐述了开洞的方法。In the project of Beijing Flower Village Industrial and Agricultural Product Exhibition and Sale Hall, due to the requirement of height, the two way prestress without bond concrete top slab of the entrance hall has to be rejected entirely along the beams all around on the primary first and second floors, with a 8m×7 45m hole. This paper details the holing method on the aspects of erecting of the plate bottom bracing system, rejecting of the concrete slab in sections, the cutting and relaxing of the prestressed reinforcement, treatment of tension end surface strengthening and restretching.
关 键 词:开洞工程 无粘结预应力 混凝土板 剔除 预应力筋
分 类 号:TU757[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157