水库内泵站进水口预留岩坎拆除设计  被引量:1

Demolishment design of reserved rock bar for intake of reservoir pumping station

在线阅读下载全文

作  者:刘占博[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《东北水利水电》2011年第3期15-18,71,共4页Water Resources & Hydropower of Northeast China

摘  要:预留岩坎挡水施工方案可有效地降低临时挡水建筑物的规模和投资。岩坎拆除一般受坎外水位影响较大,同时岩坎一般距主体建筑结构及其它设施较近,拆除爆破安全控制要求较高。文章针对某水库内新建取水泵站预留岩坎爆破拆除方案进行了分析和研究,制定了较详细的岩坎爆破拆除方案,并提出了爆破工艺和安全控制措施。The water retaining construction scheme with reserved rock bar could effectively decrease the scale and cost of temporary water retaining structure.The rock bar demolishment is greatly affected by outside water level and the higher safety blasting control is required because of the close distance from the rock bar to the main structure body and other facilities.The paper studies and analyzes the blasting demolishment scheme of reserved rock bar for the new pumping station of some a reservoir,makes detailed blasting scheme and provides blasting technique and safety control measure.

关 键 词:预留岩坎 爆破拆除方案 水库内泵站 

分 类 号:TV732.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象