利用钢铁厂烟灰制备高纯碳酸锰  

Preparation of high-purity manganese carbonate from steel plant dust

在线阅读下载全文

作  者:赵建波[1] 魏丽芳[1] 郑先君[1] 段才锋[1] 孙雨安[1] 

机构地区:[1]郑州轻工业学院河南省表界面科学重点实验室,河南郑州450002

出  处:《郑州轻工业学院学报(自然科学版)》2011年第1期51-53,共3页Journal of Zhengzhou University of Light Industry:Natural Science

基  金:河南省教育厅自然科学基金项目(2010A530013);郑州轻工业学院科研基金项目(2009xjj043)

摘  要:以某钢铁厂烟灰为原料,经酸浸出、除杂、沉淀和锰盐复分解等工艺过程得到碳酸锰.通过正交试验,得到锰浸出的最佳工艺条件为:m(硫酸)∶m(烟灰)=4∶1,温度70℃,时间2 h,此时锰浸出率可达87.7%.通过单因素实验,优化了碳化条件:n((NH4)2CO3)∶n(MnSO4)=2∶1,反应温度60℃,pH=7,陈化30 min,此时碳酸锰产率可达91%,且产品质量符合GB10503—89标准.Using steel plant dust,manganese carbonate was prepared by reaction of acid-leaching,purification,precipitation and replacement reaction.The effects of the leaching temperature,the leaching time,the mass ratio of sulfuric acid to steel dust on the leaching yield of manganese were investigated by the orthogonal test methods.The optimum leaching conditions were as follows:the mass ratio of sulfuric acid to steel dust 4∶1,the leaching temperature 70 ℃,time 2 h,the leaching yield of manganese was 87.7%.By means of single factor experiments,the optimal carbonization conditions were obtained:n((NH4)2CO3)∶n(MnSO4)=2∶1,the reaction temperature was 60 ℃,pH=7,the aging time was 30 min,and the yield of manganese carbonate reached 91%.The prepared manganese carbonate accords with GB10503—89.

关 键 词:钢铁厂烟灰 酸浸 硫酸锰 高纯碳酸锰 

分 类 号:TQ137.12[化学工程—无机化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象